Home » Roll-Off Rentals
Castle Rock Dumpster Company delivers roll-off containers to job sites and properties across Castle Rock and Douglas County, Colorado. The service is straightforward: we schedule a drop-off, the container sits on-site while you fill it on your schedule, and we haul it away once you are done. You are not working around our timeline. Rentals run from a compact 10-yard up to a 40-yard, covering the full spread of residential and commercial projects in the area. Delivery and pickup days are confirmed when you order, so you know exactly when to expect the container and when it leaves. If you are in Castle Rock or the surrounding Douglas County area, you are in the right place.
Right size. Right day. Right where you need it.
The most common and costly mistake in dumpster rental is sizing down to save money and then needing a second haul. A second haul almost always costs more than stepping up one size at the start.
Work from the job backward. A garage cleanout or bathroom remodel produces a very different volume than a full roof tear-off or a demolition debris load. A 10-yard holds about 4 pickup truck loads of waste, which is enough for a modest cleanout or small remodel. A 20-yard holds about 7 pickup truck loads of waste and handles most mid-size renovation projects comfortably. A 30-yard holds about 11 pickup truck loads of waste, a better fit for larger remodels or multi-room tear-outs. A 40-yard holds about 14 pickup truck loads of waste and is the right call on full gut renovations, large construction jobs, and commercial cleanouts.
The material type matters as much as the volume. Bulky, lightweight debris like yard waste, drywall, and lumber fills the box before it fills the weight allowance. Dense, heavy material like concrete, brick, and soil works the opposite way. Sizing is based on the debris, not on selling the biggest container.
If you are not sure which size you need, call and describe the project. We will point you to the right fit.
Every container has both a volume limit and a weight limit. Heavy material like concrete, dirt, or brick can reach the weight ceiling long before the box looks full. Bulky, lightweight debris fills the volume first. These two limits pull in opposite directions depending on what you are loading, and that distinction is what drives container choice when the project involves heavy material. Plan for both when you are deciding what goes in.
Roll-off containers handle a wide range of material: construction debris, renovation waste, yard debris, household junk, roofing shingles, drywall, lumber, flooring, and mixed loads from general cleanouts. That covers the majority of what comes out of a residential or commercial project.
Some materials cannot go in. Prohibited items typically include hazardous waste, paint, solvents, tires, batteries, appliances containing refrigerants, and certain electronics. The reason is practical, not arbitrary. If a restricted material turns up in the load, it creates a disposal problem at the transfer station that affects the entire haul, not just that one item. The container may be rejected or require sorting before it can be processed.
The practical path is simple: call before loading anything you are uncertain about. Requirements at licensed transfer and disposal facilities drive what can and cannot be accepted, and a quick question on the phone is easier than a problem at the end of the job. We handle it from there.
What makes a fast turnaround possible is having the details ready when you call: the address, where on the property the container should go, and roughly how long you need it. A clear drop location and easy access for delivery move things along quickly.
Placement on a public street may require a permit through the local authority. Requirements depend on whether the container sits on private property or in the public right of way. We confirm what applies at your address before delivery, so you are not left to figure that out on your own.
Prompt response is available even for last-minute requests, but specific slot availability depends on what the schedule allows at the time of the call. We do not promise a day or an hour we cannot confirm. What we can tell you is that delivery and pickup days are confirmed when you order. We'll take it from there.
What works on jobs around here is no mystery. The container is the same piece of equipment whether it lands in a Castle Rock driveway for a garage cleanout or on a commercial lot for a warehouse clear-out. What changes is the scope, the volume, and how the quote is structured.
Homeowners clearing a basement, attic, or full estate have different needs than contractors managing roofing tear-offs or demolition debris. Landlords and property managers handling tenant cleanouts, foreclosure cleanouts, or flip house turnovers work on tighter timelines and often need reliable scheduling across multiple jobs. Commercial clients clearing office, retail, or warehouse space are thinking about frequency and volume from the first call.
Contractors and property managers with recurring needs can discuss multi-job arrangements on the call. It's that simple.
The quoted figure covers the container size, the rental period, delivery, haul-away, and the base disposal cost. That is what is inside the number.
What sits outside it and could change the total includes weight overages if the load exceeds the included allowance, extended rental time beyond the agreed period, and any permit fees if street placement applies. The weight allowance is stated when the quote is given, so you know where the line is before you start loading.
You get the rate on the phone before anything is scheduled. Ask what the quote covers and you get a straight answer. Free estimates are available. Local knowledge. Right-sized containers. Pricing set out up front.
The rental period is confirmed on the call when the quote is given. It is set based on the project timeline you describe, and pickup is scheduled for the agreed day. If the job runs longer, call us before the period ends and we can discuss an extension.
A 15-yard holds about 6 pickup truck loads of waste and suits mid-size jobs that are too large for a 10-yard but do not need the capacity of a 20-yard. Good fits include single-room gut renovations, moderate landscaping cleanups, and smaller roofing tear-offs. If the project involves heavy material, describe it on the call since weight limits can be a factor at this size.
A 30-yard holds about 11 pickup truck loads of waste and is well-suited to large remodels, multi-room tear-outs, sizable estate cleanouts, and construction projects that generate a high volume of bulky debris. It is a common choice for contractors running larger renovation or roofing jobs in Douglas County. If you are weighing a 30-yard against a 40-yard, describe the project on the call and we will help you land on the right size.
Oil-based paint is treated as a hazardous material and cannot go in the container. Latex paint in small quantities may be handled differently depending on the disposal facility, but the safest approach is to call and ask before loading any paint. We will tell you what applies to your specific load.
Hazardous materials create a disposal problem at the licensed transfer station that affects the entire load, not just the restricted item. A load that contains hazardous waste may be rejected or require sorting before it can be processed, which delays the job and adds cost. Call before loading anything you are uncertain about.
A container loaded above the fill line cannot be transported safely and legally. If the load is over the line at pickup, it will need to be reduced before the container can be hauled. Avoid this by loading level and keeping material below the marked line throughout the fill.
Debris that extends above the container's sides or is unevenly distributed can shift during transport, creating a road hazard and a liability issue. Level loading keeps the load within legal transport limits and protects the road surface and other vehicles. It is a requirement, not a preference.
Placement on private property typically does not require a permit, but placement in the public right of way carries different requirements that vary by address. We confirm what applies at your location before delivery so nothing is left to guess. Skipping a required permit can result in fines or a forced removal of the container.
A container placed in the public right of way without the required permit can be cited or ordered removed by the local authority, which interrupts the project and may add costs. Confirming permit requirements before delivery takes a short conversation and avoids that outcome entirely. We cover this on the call before the delivery date is set.
Permit fees are set by the issuing authority and vary by location and placement duration. We confirm what applies at your address before delivery, but the fee itself is paid to the local authority, not to us. Ask about this on the call and we will tell you what we know about your specific address.
Tight maneuvering space is worth describing in detail when you call. The delivery driver needs enough room to approach, position, and leave safely, and a cul-de-sac or narrow access point may limit where the container can be set down. Working through the access details before delivery avoids a situation where the container cannot be placed as planned.
Yes. Placing a container over a drain or in a low spot where water collects can cause problems during a rain event and may damage the surface beneath the container. A flat, stable surface with clear drainage around it is the best placement. Describe the site on the call and we will flag any concerns before delivery.
Enough clearance to load safely from all sides is the practical baseline, and avoiding overhead lines is a firm requirement. The specific distance depends on the size of the container and the layout of your property. Work through the placement details on the call so the drop location is confirmed before the driver arrives.
Protection materials are not something we supply. If your driveway surface is a concern, arrange for plywood or similar materials on your end before the container arrives. Mention the surface type on the call and we can note it for the delivery.
The call is short. Give us the address, describe the project, and tell us where the container should go. You get a price before anything is scheduled, and delivery and pickup days are confirmed before the call ends.
Castle Rock Dumpster Company is reachable at (720) 924-5398 every day from 6:30 AM to 9:00 PM. Call for a quote. Ready for your project. Call us now.
Choosing the right container starts with understanding what the job will actually produce. Rentals run from a compact 10-yard up to a 40-yard, with a low-profile lowboy option for dense, heavy material that needs a different approach. Call us and describe the project, and we will point you to the right fit before anything is scheduled.
| Dumpster Size | Measurements (LxWxH) | Capacity | Weight Allowance | Common Uses |
|---|---|---|---|---|
| 10-Yard | 12' x 8' x 3.5' | 10 cubic yards, about 4 pickup truck loads of waste | 1 to 2 tons included | Small garage cleanout, Bathroom remodel debris, Single-room clear-out, Light yard waste |
| 10-Yard Lowboy | 12' x 8' x 2' | 10 cubic yards, built for heavy material where weight matters more than volume | 2 to 3 tons included | Concrete removal, Brick and masonry debris, Dirt and soil hauling |
| 12-Yard | 14' x 8' x 3.5' | 12 cubic yards, about 5 pickup truck loads of waste | 2 tons included | Kitchen remodel cleanout, Small deck removal, Moderate junk removal |
| 15-Yard | 16' x 8' x 4' | 15 cubic yards, about 6 pickup truck loads of waste | 2 to 3 tons included | Single-room gut renovation, Moderate roofing tear-off, Landscaping cleanup |
| 20-Yard | 22' x 8' x 4.5' | 20 cubic yards, about 7 pickup truck loads of waste | 3 tons included | Mid-size renovation projects, Multi-room remodel debris, Flooring and drywall removal, Estate cleanouts |
| 30-Yard | 22' x 8' x 6' | 30 cubic yards, about 11 pickup truck loads of waste | 4 tons included | Large remodels and tear-outs, Sizable estate cleanouts, Commercial clear-outs, High-volume roofing jobs |
| 40-Yard | 22' x 8' x 8' | 40 cubic yards, about 14 pickup truck loads of waste | 5 to 6 tons included | Full gut renovations, Large construction sites, Commercial warehouse cleanouts, Major demolition debris |
How do I estimate the right container size based on the type of debris I have?
The two factors that drive size are volume and material density. Bulky, lightweight debris like drywall, lumber, and yard waste fills the box before it hits the weight limit, so volume is what you size for. Dense material like concrete, brick, and dirt works the opposite way and can hit the weight ceiling while the container still looks half-empty. Describe what you are loading when you call and we will help you land on the right fit.
What materials count as heavy debris that would need a lowboy instead of a standard container?
Concrete, asphalt, brick, stone, tile, and compacted soil are the most common examples. These materials are dense enough that a standard container can reach its weight limit well before the volume is filled, which creates a transport problem. The lowboy is built with a lower profile and a higher weight tolerance for exactly these loads. If your project involves breaking up a patio, a driveway, or a foundation section, the lowboy is worth discussing on the call.
Honest Advice on the Right Size
We size based on the debris and the project, not on moving you up to a larger container. Describe the job on the call and we will point you to the fit that makes sense.
What does the quoted price include, and what could change the total?
The quoted figure covers the container size, the rental period, delivery, haul-away, and the base disposal cost. What can move the total is a load that exceeds the included weight allowance, a rental that runs past the agreed period, or a permit fee if the container sits in the public right of way. The weight allowance is stated when the quote is given so you know where the line is before you start loading. You get the rate on the phone before anything is scheduled.
What happens if my load goes over the weight allowance?
Weight overages are billed at a per-ton rate set when the quote is given. The overage is calculated at the disposal facility when the load is weighed, and the charge is added to the final bill. Knowing the included allowance before you load is the straightforward way to avoid it. If you think the project might run heavy, mention it on the call and we can talk through the right size and allowance for the job.
How do I extend a rental if the project takes longer than expected?
Call before the agreed pickup date and let us know the project needs more time. We will check what the schedule allows and confirm a new pickup date along with any additional rental cost. The extension rate is set on that call so you know the added cost before the date is pushed. Do not wait until the pickup day to ask, because the schedule may already be set for that slot.
Rate Confirmed Before the Drop-Off
You get the price on the phone before anything is scheduled, including what the weight allowance covers and what could change the total.
How does the fill-line rule work and why does it matter?
Every container has a marked fill line at the top of the side walls. Material loaded above that line cannot be transported legally or safely. If the load is over the line when pickup is scheduled, it will need to be reduced before the container can be hauled. Loading level and keeping debris below the marked line throughout the job is the practical way to stay within limits and avoid a delay at the end of the project.
What items are prohibited from going in the container?
Hazardous materials are the main category: paint, solvents, motor oil, pesticides, and similar chemicals. Tires, batteries, appliances containing refrigerants, and certain electronics are also excluded. The restriction is practical. A prohibited item in the load creates a problem at the disposal facility that can affect the entire haul, not just that one item. If you are unsure about something specific, call before loading it and we will tell you what applies.
How do I protect my driveway from damage during the rental?
Placing plywood sheets under the container's contact points distributes the weight and reduces the risk of cracking or gouging a concrete or asphalt surface. That is something to arrange on your end before the container arrives, since protection materials are not something we supply. Mention the driveway surface when you call and we can note it so the placement is handled with that in mind.
Placement Agreed Before The Drop
The drop location is confirmed before the delivery date is set, so the container lands exactly where you need it and access details are worked out in advance.
How flexible is the delivery window if my schedule changes after booking?
Delivery and pickup days are confirmed when you order. If your schedule shifts before the delivery date, call us and we will work with what the schedule allows at that point. Changes made well ahead of the confirmed date are easier to accommodate than last-minute adjustments. Prompt response is available even for short-notice requests, but specific slot availability depends on what is open at the time of the call.
How is the container placed on the property, and who decides the exact spot?
You choose the placement location when you call, and we confirm it before delivery so the drop is set where you need it. A flat, stable surface with enough clearance on all sides for loading is the practical baseline. Overhead lines are a firm constraint regardless of where you want the container placed. If the site has tight access, a narrow driveway, or other conditions worth noting, describe them on the call so the delivery can be planned around them.
Not sure which size fits your project or whether the lowboy makes more sense for what you are hauling? Call us at (720) 924-5398 any day from 6:30 AM to 9:00 PM and we will work through the details with you before anything is scheduled.